Week 6 Day 7 Assignment - 5. PROJECT CONDITIONS 1. Project...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
5. PROJECT CONDITIONS 1. Project Assumptions Gut kitchen Rewire electric Time frame of 12 weeks or less 2. Project Risks # Risk Area Likelihoo d Risk Owner Project Impact-Mitigation Plan 1 Installing Sky lights Medium Project manager The sky lights need to be installed on a day that weather permits so that the home owner is not inconvenienced more that what is necessary. If installation is done on a day of inclement weather, damage to the kitchen may occur. 2 Electricity High Project Manager Depending upon the severity of the wiring in the kitchen, the electrician may have more work than what was previously scheduled. This could delay the time frame by as much as a week. 3 Gutting Kitchen Low Project manager As with many older kitchens, there runs the risk of wood that may need replaced before the new cabinetry can be installed. This risk may set the team back by one to two weeks. 4
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/24/2010 for the course IT 241 AAGB0MCPS2 taught by Professor Georgemateaki during the Spring '10 term at University of Phoenix.

Page1 / 3

Week 6 Day 7 Assignment - 5. PROJECT CONDITIONS 1. Project...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online