2.10 - 2.10(a The event both subcontractors will be...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
2.10 (a) The event “both subcontractors will be available” = AB , hence since P ( A B ) = P ( A ) + P ( B ) - P ( AB ) P ( AB ) = P ( A ) + P ( B ) - P ( A B ) = 0.6 + 0.8 - 0.9 = 0.5 (b) P (B is available A is not available) = P ( B A ) = P BA P A ( ) ( ) while it is clear from the following Venn diagram that P BA ( ) = P ( B ) - P ( AB ). A AB B A Hence P BA P A ( ( ) ) = P B P AB P A ( ) ( ) ( ) 1 = (0.8 - 0.5)/(1 - 0.6) = 0.3/0.4 = 0.75 (c) (i) If A and B are s.i., we must have P(B A) = P(B) = 0.8. However, using Bayes’ rule,