CEE 498 - HW6

CEE 498 - HW6 - CEE 498 Fall, 2004 HW 6 1. Classify and...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
CEE 498 Fall, 2004 HW 6 1. Classify and state possible control solutions for the following risks. Make sure, to classify the risks as known, known-unknown, or unknown-unknown, also classify them by source. 1) Cinder cone volcano forms in the middle of the jobsite Risk Classification: Unknown – Unknown Source Classification: Technological Problems Control Solutions: Risk Avoidance – not within contractor’s control 2) Owner declares bankruptcy Risk Classification: Known – Unknown Source Classification: Socioeconomic Control Solutions: Insurance – all losses are insured Risk Acceptance with Contingency – protects all assets 3) Jobsite is in the middle of a swamp Risk Classification: Known Source Classification: Technological Problems Control Solutions: Risk Reduction – look for another job with less risk Risk Acceptance with Contingency – account for loss in bidding Contingency Planning – plan ahead for problems 4) Kids steel ail lumber from jobsite Risk Classification: Known Source Classification: Socioeconomic Control Solutions: Insurance – materials are insured from theft Safety/Loss Control Program – helps prevent the loss of materials
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/25/2010 for the course CEE ID taught by Professor Russeljeffries during the Spring '10 term at Wisconsin.

Page1 / 3

CEE 498 - HW6 - CEE 498 Fall, 2004 HW 6 1. Classify and...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online