hw7 (completed)

hw7 (completed) - 2) a. z = -3.798 + 113.4*.03 10.07*.05 +...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
1) a. z = -4.717 + 0.904*1*0*6 + 3.409*0 – 19.31*1*0.1 + 0.055*12 = -5.988 P(Success) = (e^z)/(1+e^z) = .0025/1.0025 = .0025 b. The best way to increase the probability of success is to implement a constructability program and sign a lump sum contract rather than the reimbursable contract. Doing this results in a probability of success of 94.5%
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 2) a. z = -3.798 + 113.4*.03 10.07*.05 + 0.942*2 + 0.176*12 = 3.0965 P(Success) = (e^z)/(1+e^z) = .9567 b. The probability of success could be improved by reducing team turnover rates, putting more money into the control system cost, and holding more control meetings during the construction phase....
View Full Document

This note was uploaded on 04/25/2010 for the course CEE ID taught by Professor Russeljeffries during the Spring '10 term at Wisconsin.

Ask a homework question - tutors are online