ENB247 QUT Site Survey Report - Final

ENB247 QUT Site Survey Report - Final - E + c 8 n v i si on...

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
Samford Site Survey E n v i s i o n E n g i n e e r i n g + 6 1 4 0 7 1 5 0 0 0 5 c e o @ e n v i s i o n . c o m . a u 8 / 2 6 / 2 0 0 9 Daniel Kasapis Danial Ikladious Matthew McGregor Francis Paraha ocumentMaster/ViewDocumentFTP.aspx?key=nbxpa4OBvZdXZZK1S%2bOVEOyKjwlIGj9DpvZIo0GhMVKeD8Zg%2f5n0nw%3d% cumentMaster/ViewDocumentFTP.aspx?key=nbxpa4OBvZdXZZK1S%2bOVEOyKjwlIGj9DpvZIo0GhMVKeD8Zg%2f5n0nw%3d% Borehole log Samford Valley. Taken from B.Jones Report
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Envision Engineering Faculty of Built Environment and Engineering Queensland University of Technology Dear Mr. Smith, Re: Site Survey (Samford) Thank you for allowing Envision Engineering to conduct a site survey report on the proposed redevelopment of the Samford site. Attached is the site survey for the Samford Site , in which Envision Engineering details our thorough analysis of the site, along with documentation and justification. The main focus was to outline main constraints and advantages this site offers. Important considerations for the design included transport, water infrastructure, site planning and environmental considerations. To account for the unique requirements of the site (such as the 75% foliage cover) this site survey has strong emphasis on the constraining aspects of the development. Our site survey allows the developer to clearly see the many factors hindering the development, as well as the advantages this site brings. We hope that this site survey be included in future considerations regarding the development of the Samford Site. Please contact us if you have any questions or concerns regarding the report. Yours sincerely, Envision Engineering. 2
Background image of page 2
Contents 3
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
1.0Executive Summary 4
Background image of page 4
2.0Introduction This Site survey report contains relevant information regarding the redevelopment of the site at Camp Mountain Samford. This report is merely a presentation of the findings of the site and is intended to be a guide for future development. The report contains detailed information concerning the site with features such as: plans clearly showing important features of the site, a systematic analysis of the site amongst other things. During this process, a number of things were identified such as: the environmental outcomes/ values for the site as identified by local planning policy; the major constraints on site development and how to address these constraints, the proposed site’s potential and how these can benefit the development, aspects of the surrounding suburban areas that could have a significant effect on the nature of the development, consideration of the potential for sustainable transport options and existing land classification issues and possible changes (if feasible) amongst other planning issues. The report has been written in a manner that takes into account the four main sub-divisions:
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 6
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 49

ENB247 QUT Site Survey Report - Final - E + c 8 n v i si on...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online