WEEK4 PAPER - Project Management Performance 1 Running...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Project Management Performance 1 Running head: PROJECT MANAGEMENT PERFORMANCE Project Management Performance Paper Christopher Wall OPS/HC571 May 3, 2010 Rachelle Feagin University of Phoenix
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Project Management Performance 2 Project Management Performance Identify constraints present when measuring the productivity in the attached example. There are several constraints present when measuring the productivity in the attached example. First, while measuring multiple factor productivity, there is a constraint that every meal is not the same and requires a different amount of time from cooks and preps. Second, in the short run it is not possible to change the number of cooks or prep in response to changes in demand for meals. Third, there is a constraint of space; the expansions in the number of meals are limited by the amount of space available. Four, the space constraint also applies to employees, a larger number of preps and cooks cannot be applied in the same space. Fifth, the numerical constraint is that the proportion among the preps, cooks, and cashiers needs to be maintained. Sixth, the constraint is that the same meal has to be prepared every day, again and again, otherwise the cost of materials, the use of energy, and the number of labor hours will change. Seventh, beyond a certain level of production, the total capital as well as total other costs will change. Describe what project management application you might use to measure and improve the
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 04/27/2010 for the course MBA 128798 taught by Professor Jenings during the Spring '10 term at University of the South Pacific, Fiji.

Page1 / 5

WEEK4 PAPER - Project Management Performance 1 Running...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online