Cost_Breakdown - 20 R.C.H. CONSTRUCTION COST BREAKDOWN...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 20 R.C.H. CONSTRUCTION COST BREAKDOWN ITEMS DESCRIPTION BUDGET AMOUNT 10 GENERAL CONDITIONS $ 101 Architecture and Design 10 0 102 Permits and Fe s 10 0 105 Soil Engine ring 20 0 106 Structural Engine ring 10 0 107 Survey and Topography 20 0 109 Insurance and Bonds 10 0 1 1 Supervision 30 0 1 5 Temporary Sanitation 50 150 Temporary Utilities 10 0 19 Contingency (10% of Hard Costs) 20 0 20 SITE WORK 210 Clearing and Grub ing 20 0 2 1 Site Grading 20 0 2 2 Excavation and Backfil 20 0 2 4 Erosion Control 250 25 Permanent Utilities 10 0 280 Sewer Con ections - Septic Tank 250 30 CONCRETE 310 Formwork 20 0 320 Ste l Reinforcement 50 3 0 Concrete Foundation 250 3 1 Concrete Slabs and Patios 50 3 5 Concrete Driveways 150 40 MASONRY 421 Fireplace Masonry 10 0 42 Concrete Blocks 250 425 Fireplace Facing/Stone Mantel 50 50 METALS 505 Containers 10 0 510 Rough Frame Hardware 20 0 512 Structural Ste l 20 0 60 WO DS AND PLASTICS 610 Rough Carpentry Labor 30 0 61 Framing/Sheathing Materials 350 620 Finish Carpentry Labor...
View Full Document

Page1 / 2

Cost_Breakdown - 20 R.C.H. CONSTRUCTION COST BREAKDOWN...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online