example gantt - Research Product Benchmark Group Meeting...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Sheet1 Page 1 Tasks Start Duration (days) Completion (%) Completion Plot Duration Plot Group Meeting 04/02/08 1 100 1 0 Hand Sketches 07/02/08 2 66 1.32 0.68 Research Product 07/02/08 2 50 1 1 Benchmark 07/02/08 2 33 0.66 1.34 Group Meeting 09/02/08 1 0 0 1 Conceptual Report 04/02/08 7 75 5.25 1.75 L11 Submit Report 11/02/08 1 0 0 1 Product Dissection M 01/03/08 7 0 0 7 ... L11 Project Due 31/03/08 1 0 0 1 PACE 09/04/08 1 0 0 1 Group Meeting Hand Sketches
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Research Product Benchmark Group Meeting Conceptual Report L11 Submit Report Product Dissection Meeting ... L11 Project Due PACE 03/02/08 10/02/08 17/02/08 24/02/08 02/03/08 09 Engineering 1C03 Project Timeline Sheet1 Page 2 9/03/08 16/03/08 23/03/08 30/03/08 06/04/08 (Group 9901)...
View Full Document

This note was uploaded on 05/02/2010 for the course ENGINEERIN 1C03 taught by Professor T.doyle during the Spring '10 term at McMaster University.

Page1 / 2

example gantt - Research Product Benchmark Group Meeting...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online