M6 StudyGuide

M6 StudyGuide - SCM 300 MODULE 06 Study Packet Module 06:...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
SCM 300 – MODULE 06 Study Packet Module 06: SCM Integration (Push/Pull, JIT, Postponement, Bullwhip effect, Integration risks) With the basic supply chain ingredients in hand (procurement, logistics, manufacturing) this module looks to demonstrate the difficulties encountered when managers try integrating all of the supply chain pieces. Push and Pull ideologies will be discussed as will the philosophy of JIT. In addition, a list of risks will be explored and potential strategic options will be considered. Finally, during lecture a series of examples about some of these options will be discussed. Reading Assignments: Earth 98-106, 111, 115       Concepts   Examples   What is the value of  each?   Lean Systems 98-106 Toyota (4  Principles) 98-99 Close Supplier Ties 102-3 Push/Pull  Methods 104 Rocks/Water 100-1 Small Lot Sizes 103 JIT Philosophy 100-1 Kawasaki 101 Quality at the  Source/Jidoka 104-5 Terms and Lists   Panasonic 102 Uniform Workstation  Loads 105-6 Set- up/changeover 103 Toyota (RFID) 105 Standardized Components 106 Poka-yoke 105 New Balance 111 Flexible Workforce 106-7     Univ. of Pitt Med Ctr. 115 Automation 107             Puzzle 130- 54         Concepts   Terms and Lists       Process  Integration 131 CRM 133-4 Forward Buying
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 3

M6 StudyGuide - SCM 300 MODULE 06 Study Packet Module 06:...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online