Consultant Scenario - 58. You have been contracted to build...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
58. You have been contracted to build a network for a multimedia development firm that currently uses a 10-Mbps Ethernet network. The company requires a high-bandwidth network for the multimedia team, which constantly views and manipulates large files across the network. The company is expecting moderate growth. You are to come up with a solution to support the highbandwidth applications and growth potential of this company. Required result: Increase network bandwidth. Optional result: Support future growth. Improve server response time. Proposed solution: Install CAT 5 UTP cable in a star topology with the existing hub. Upgrade the workstation’s adapter cards to support 100 Mbps. Increase the amount of RAM in the server. The proposed solution ___________. (Chosen Answer, A) a. achieves the required result and both optional results b. does not achieve the required result but achieves both the optional results c. does not achieve the required result but does achieve one of the optional results
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 05/09/2010 for the course IT 221 1 taught by Professor Conrad during the Spring '10 term at University of Phoenix.

Page1 / 2

Consultant Scenario - 58. You have been contracted to build...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online