PPP calcs - 0.07 750 time saved(hr Saved 6.27 $2.03 0.01 12.60 $1,797.36 5.99 18.93 $3,592.69 7.98 1.18 31.60 $7,183.36 9.58 37.87 $8,962.83 9.96

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Piles ft/pile total ft 300 50 15000 wood PPP Feet/hr 150 200 Piles /set 15 300 # pads/set 24 6 # sets 20 1 sets changed 20 1 time/change (min) 20 4 cost/set 50 ? 1777.44 total cost 1000 ? 1777.44 av. Cost/hr renting 238 238 ft/set hours 100 75 Time for changouts 6.67 0.07 ft sets tot. cost 25386.67 17865.87 3000 4 6000 8 9000 12 $7,720.80 10.29% 15000 20 18000 24 22500 30 cost per pad existing purchase $888.72 $415.08 0.05
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 0.07 750 time saved (hr) Saved 6.27 $2.03 0.01% 12.60 $1,797.36 5.99% 18.93 $3,592.69 7.98% 1.18 31.60 $7,183.36 9.58% 37.87 $8,962.83 9.96% 47.37 $11,655.83 10.36% 3000 6000 9000 15000 18000 $0.00 $2,000.00 $4,000.00 $6,000.00 $8,000.00 $10,000.00 $12,000.00 $14,000.00 22500 Column I...
View Full Document

This note was uploaded on 05/12/2010 for the course MAR 5805 taught by Professor Sawyer during the Fall '08 term at University of Florida.

Page1 / 3

PPP calcs - 0.07 750 time saved(hr Saved 6.27 $2.03 0.01 12.60 $1,797.36 5.99 18.93 $3,592.69 7.98 1.18 31.60 $7,183.36 9.58 37.87 $8,962.83 9.96