{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

ProjectProposal - OEM 2009 EI N 6905 M ast er's Pr oject...

Info iconThis preview shows pages 1–7. Sign up to view the full content.

View Full Document Right Arrow Icon
OEM 2009 EIN 6905 Master’s Project NASA Constellation Supply Chain Optimization
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Agenda Objective Illustrative Description Plan Schedule for Completion Issues to Confront Draft Outline Relevant Course Material
Background image of page 2
Define clearly the flow of information across the supply chain for the NASA Constellation Program using the latest industrial standards. Objective
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Illustrative Description
Background image of page 4
Plan Discussions with Constellation SCM Specialists Michael Galluzzi Edgar Zapata Martin Steele Accounting Office Identify key network nodes projected over next several decades Low Earth Orbit Low Lunar Orbit Lunar Surface Martian Surface Etc. Form a complete, general picture of information flow Data Costs
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Schedule for Completion 01/12-01/16 Discuss SCM information flow with Galluzzi, Zapata, Steele 01/19-01/23 Discuss SCM accounting with Constellation accounting people 01/26-01/30 Install and learn SpaceNet software 02/02-02/06
Background image of page 6
Image of page 7
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}