Solution_All_Six - Material Cloth Fasteners Purchased Parts...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
Material - Cloth 26,000.00 - Fasteners 4,000.00 - Purchased Parts 40,000.00 70,000.00 Basis of Allocation Cost rates Material Handling - Labour 8,000.00 Direct Material cost 70,000.00 0.30 - Equipment Depreciation 5,000.00 - Electrical Power 2,000.00 - Maintenance 6,000.00 21,000.00 Assembly - Machinist 5,000.00 Machinist Hours 10.00 Design - Labour 5,000.00 Units Produced 40,000.00 0.35 - Electric Power 1,000.00 - Overhead 8,000.00 14,000.00
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
a. providing same day service Value Adding b. closing store on weekends Non - Value Adding c. providing free delivery service Non - Value Adding d. having seamstress on site Value Adding e. making customers pay for parking Value Adding
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Division A Division B Division C Division D direct materials used 3 7 G 8 total manufacturing costs 6 D H 14 manufacturing overhead 1 3 2 J direct labor A 6 4 4 ending work in progress inventory B 3 2 5 cost of goods manufactured 7 20 12 L 2 E 3 K ending finished goods inventory 2 6 I 9 3 F 5 7 cost of goods sold C 18 13
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 05/13/2010 for the course MECH 17657 taught by Professor Ravikant during the Spring '10 term at Indian Institute of Technology, Delhi.

Page1 / 7

Solution_All_Six - Material Cloth Fasteners Purchased Parts...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online