hw_UVWX - E2 the plant at site 2 is completed by the...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
A college library has five copies of a certain text on reserve. Two copies (1 and 2) are first printings, and the other three (3, 4, and 5) are second printings. A student examines these books in random order, stopping only when a second printing has been selected. One possible outcome is 4, and another is 125. a) List all outcomes in the sample space S. b) Let A denote the event that exactly one book must be examined. What outcomes are in A? c) Let B be the event that book 4 is the one selected. What outcomes are in B? d) Let C be the event that book 2 is not examined. What outcomes are in C?
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
An engineering firm is constructing power plants at three different sites. Define the events E1, E2, and E3 as follows: E1 the plant at site 1 is completed by the contract date.
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: E2 the plant at site 2 is completed by the contract date. E3 the plant at site 3 is completed by the contract date. Draw a Venn diagram that depicts these three events as intersecting circles. Shade the region on the Venn diagram corresponding to each of the following events (redraw the Venn diagram for each question): a. At least one plant is completed by the contract date. b. All plants are completed by the contract date. c. None of the plants is completed by the contract date. d. Only the plant at site 1 is completed by the contract date. e. Exactly one of the three plants is completed by the contract date. f. Either the plant at site 1 or site 2 or both of the two plants are completed by the contract date....
View Full Document

This document was uploaded on 05/15/2010.

Page1 / 4

hw_UVWX - E2 the plant at site 2 is completed by the...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online