Grup_14 - GROUP 10 YORTANLI DAM Information About Allianoi...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
GROUP 10 YORTANLI  DAM
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Information About Allianoi Allainoi is a big treasury and has many  historical monuments. There is a thermal center that placed  upon 9.000 square meters. Every year a lot of tourists visit Allianoi. When Yortanlı Dam will be built, Allianoi  will go under 17 meters water.
Background image of page 2
          EXPECTED   Yortanli Dam Project  Construction started in 1993. The project was expected to be  concluded in 3 years. 7793 hectares areas will be irrigated  with 37 million cubic meters water. The solution of area’s going under water  is curtain walls.
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
The Project got finished in 2008, so it went on  for 15 years. As the project got postponed more and more,  the cost increased. There are rumors that some people got  unearned income from this postponement. During the transportment, historical 
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 05/16/2010 for the course MAN. ENG. isl taught by Professor M.e. during the Spring '09 term at Istanbul Technical University.

Page1 / 18

Grup_14 - GROUP 10 YORTANLI DAM Information About Allianoi...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online