LAR 298 - GERENCIA DE DISTRIBUCIN DIVISIN INGENIERA Y OBRAS...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: GERENCIA DE DISTRIBUCIN DIVISIN INGENIERA Y OBRAS DIBUJ: ELABOR: REA NORMAS REVIS: G.V. LNEA RURAL 13,2 11, 4 7,6 6,6 kV ESTRUCTURA DE ALINEAMIENTO BIFILAR EN H APROBACIN: 07-10-98 LTIMA REVISIN: 10-11-03 LAR 298 Pg 1 de 2 LISTA DE MATERIALES SMB. a2 c 14 p4 r1 z 19 CANT. 2 1 2 2 2 CDIGO SAP 6762360 6762451 6762123 6762174 ESP. TCNICA ET-253 ET-401 ET-201 ET-413 ET-436 DESCRIPCIN Aislador de suspensin ANSI 55-5 Cruceta de madera limatn inmunizada de 4 m Poste de concreto de 12 m , 510 kg (1) Porta aislador pasante para cruceta de madera 11,4 13,2 kV Abrazadera en U tipo 1 ALTERNATIVA: (1) Poste de madera de 12 m , tipo liviano. NOTA: - Vano viento mximo 400 m . Fecha 10-11-03 Actualizaciones Descripcin Actualizacin Cdigos SAP GERENCIA DE DISTRIBUCIN DIVISIN INGENIERA Y OBRAS DIBUJ: ELABOR: REA NORMAS REVIS: G.V. LNEA RURAL 13,2 11, 4 7,6 6,6 kV ESTRUCTURA DE ALINEAMIENTO BIFILAR EN H APROBACIN: 07-10-98 LTIMA REVISIN: 10-11-03 LAR 298 Pg 2 de 2 ...
View Full Document

{[ snackBarMessage ]}

Page1 / 2

LAR 298 - GERENCIA DE DISTRIBUCIN DIVISIN INGENIERA Y OBRAS...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online