CS 209 - ANDEN EN CONCRETO 100 500 Concreto 175 Kg/cm2 2500...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ANDEN EN CONCRETO 100 500 Concreto 175 Kg/cm2 2500 PSI Tierra Negra Banda Plstica (Ver norma CS 273) Sub Base Granular SBG-4 ZONA VERDE 100 500 580 580 1060 Relleno con Tierra de la Excavacin Compactada en capas de 150mm2 Arena de Pea Tubos de PVC (Tipo TDP) Base compacta de arena de pea 60 340 110 60 110 40 60 110 60 110 40 340 CRUCE CALZADA EN ASFALTO 500 1500 CRUCE CALZADA EN CONCRETO 150 500 500 400 Sello Asfltico MDC-3 50 mm Concreto para Pavimento Mdulo de Rotura >43Kg/cm2 Reemplazo Total de la Losa Base Asfltica MDC-1 100 mm Base Granular BG-2 o B-600 530 1060 400 1330 Banda Plstica (Ver norma CS 273) 60 Sub Base Granular SBG-4 Arena de Pea Tubos de PVC (Tipo TDP) Base compacta de arena de pea 60 110 60 110 40 340 340 110 60 110 40 NOTAS: - Tener en cuenta las recomendaciones de construccin de la Norma CS 203 - Dimensiones en mm GERENCIA DE DISTRIBUCIN SUBGERENCIA INGENIERA Y OBRAS DIBUJ: REA NORMAS ELABOR: REA NORMAS REVIS: l. E. P,. DETALLES DUCTOS, ZANJAS Y RELLENOS 4 DUCTOS DIMETRO 4" APROBACIN: 08-07-99 LTIMA REVISIN: 18/12/2003 CS 209 Pg 1 de 1 ...
View Full Document

This note was uploaded on 05/18/2010 for the course ELECTRICAL Electrical taught by Professor Electrical during the Spring '10 term at Universidad Nacional de Colombia.

Ask a homework question - tutors are online