Fig5-24 - 5 6 Refinery 0 5.0 4 Station 3 6 Refinery 6 4.0 5...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Units -- Arcs -- Upper of Flow From To Bound Nodes Net Flow 5.0 1 Oil Field 2 Station 1 6 1 Oil Field 0 4.0 1 Oil Field 3 Station 2 4 2 Station 1 0 3.0 2 Station 1 4 Station 3 3 3 Station 2 0 2.0 2 Station 1 5 Station 4 2 4 Station 3 0 2.0 3 Station 2 4 Station 3 2 5 Station 4 0 2.0 3 Station 2 5 Station 4
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 5 6 Refinery 0 5.0 4 Station 3 6 Refinery 6 4.0 5 Station 4 6 Refinery 4 9.0 6 Refinery 1 Oil Field 9999 9.0 Maximal Flow Northwest Petroleum Maximize: B16 By Changing: B6:B14 Subject to: K6:K11=L6:L B6:B14<=G6: B6:B14>=0 Supply/Demand 0 0 0 0 0 0 L11 :G14...
View Full Document

Page1 / 2

Fig5-24 - 5 6 Refinery 0 5.0 4 Station 3 6 Refinery 6 4.0 5...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online