AGGREGATE PLANNING (AP) / SALES & OPERATIONS PLANNING (S&OP) PART III
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
AP by Linear Programming Objective function: Cost minimization LP Model: subject to { } = + + + + + + T 1 t t S t U t O t R t I t F t H S c U c O c R c I c F c H c minimize T t 1 F H W - + = - D - S P I + + = - U O R n K + = = T t 1 0 U , S , O , R , P , I , F , H , W t t t t t t t t t Spring 2010 2 IE 324 – AP / S&OP 
Background image of page 2
AP by Linear Programming Extensions of the model: Minimium inventory level Production capacity Backorders allowed .. - + - = t t t I I I required) ock (safety st ss I t t t t C P Spring 2010 3 IE 324 – AP / S&OP 
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
AP by Linear Programming Extensions of the model: Convex piece-wise linear cost function can also be accepted. Example: unit overtime cost per hour increases after a certain number of overtime hours (O L ) C O1 < C O2 . Spring 2010 4 O L O t Total overtime cost, $ C O2 C O1 Two new decision variables are to be introduced: O 1t and O 2t . Additional constraints: O t = O 1t + O 2t 0 O 1t O L 0 O 2t In the objective function: ....+ Σ (C O1 O 1t + C O2 O 2t )+. .....
Background image of page 4
AP by Transportation Formulation Transportation formulation of the AP, when backorders are not permitted when backorders are permitted Spring 2010 5 IE 324 – AP / S&OP 
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Disaggregating Aggregate Plans Aggregate planning is a top-down approach. Hence, to arrive at individual item plans, the AP is to be disaggregated into
Background image of page 6
Image of page 7
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 05/23/2010 for the course IE 324 taught by Professor T during the Spring '10 term at Middle East Technical University.

Page1 / 18

5-Aggregate_Planning_Part_III - A GGREGATE PLANNING (AP) /...

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online