6-MPS_Part_I - Hierarchical nature of planning Mast er...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Hierarchical nature of planning Mast er Production Scheduling and MPS Business environments for the MPS MPS linkages in the Manufactur ing Planning & Control Demand management in general MPS techniques Tabular (spreadsheet) approach Mathematical modelling Rule based ATP M aster Pr oduction Schedule (M PS) Par t I I tems I tems Pr oduct Pr oduct lines or lines or families families I ndividual I ndividual pr oducts pr oducts Component Component s M anufactur in M anufactur in g oper ations g oper ations Resour ce Resour ce Level Level Plant Plant s I ndividual I ndividual machines machines Cr itical Cr itical wor k wor k center s center s Pr oduction Pr oduction Planning Planning Capacity Capacity Planning Planning Resour ce r equir ement s plan Rough- cut capacity plan (RCCP) Capacity r equir ements plan (CRP) I nput/ output contr ol Sales and Oper ation s Plan (S& OP) M aster pr oductio n schedule (MPS) M ater ials r equir emen ts plan (MRP) Shop floor schedul e All All wor k wor k center center s H ier ar chical Natur e of Planning IE 324 - Lecture Notes on MPS IE 324 - Lecture Notes on MPS Spring 2010 Spring 2010 2 M aster Pr oduction Schedule (M PS) (Ana r etim Plan ) MPS is the item (or final product) production plan over periods in the planning horizon. MPS shows when products will be available in the future MPS is a statement of planned future output, not a statement of demand. MPS is the translation of the AP (S& OP) into producible products with their quantities and timing . On a day-to-day basis, the MPS provides the information by which sales (market) and manufacturing are coordinated. IE 324 - Lecture Notes on MPS IE 324 - Lecture Notes on MPS Spring 2010 Spring 2010 3 M aster Pr oduction Schedule (M PS) At the execution level: As production is completed and products are used to meet customer requirements over time, the MPS record must be kept up to date implement a periodic review and update cycle that is termed rolling through time....
View Full Document

Page1 / 18

6-MPS_Part_I - Hierarchical nature of planning Mast er...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online