LECTURE # 25 Spring 2010 Dr. Ivan Damnjanovic CVEN 349: Civil Engineering CVEN 349: Civil Engineering Project Management Project Management
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Estimating Methods Estimating Methods Unit pricing Resource enumeration
Background image of page 2
Unit Pricing Unit Pricing Once we know the unit quantity, we can calculate a total cost by: unit quantity x unit cost Unit pricing values are available in many references: RS Means Company. Building Construction Cost Data FR Walker’s The Building Estimator’s Reference Book
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
What is included in Unit Cost? What is included in Unit Cost?
Background image of page 4
Cost of resources Cost of resources Production rate of resources Production rate of resources
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Problems with Unit Cost Method Problems with Unit Cost Method Problems: Often no record of crews, cost and production rate Cost will vary over time Solution: Keep the data on men-hour or resource- hour per unit value for each item
Background image of page 6
Resource Hour per Unit Resource Hour per Unit Resource-hours RH/Unit = Unit Cost/Unit =RH/Unit Average hourly cost per resource e
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 8
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 05/28/2010 for the course CVEN 349 taught by Professor Damjanovic during the Fall '09 term at Texas A&M.

Page1 / 16

L25 (Cost Estimation II) - CVEN 349: Civil Engineering...

This preview shows document pages 1 - 8. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online