Brandon Fallaw brandonfallaw@yahoo.com (478)295-2091 03/31/2010 8am to 5pm: Laid 24” and wacky packed back 270. 04/01/2010 8am to 5:30: 270 laid two 24” across road. Wacky packed back. 04/05/2010 8:30am to 2:30pm: 270 and dump truck hauled dirt on dam. 2:30pm to 5:30pm: Dressed up slopes. 04/06/2010 04/07/2010 8am to 9:30am: Hauled 200 to horse shoe. 9:30am to 11:30pm: 200 pushed down trees for power people. 04/08/2010 8am to 5:20pm: Sat MH and dressed up ditch with 305 and 270. 04/13/2010 8am to 2:30pm (minus one hr for lunch): Dressed up pond for grassing 305 & 650 and grassed.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/02/2010 for the course SCI 241 taught by Professor Williams during the Spring '10 term at University of Phoenix.

Page1 / 2

Harper & Son's 2 - Harper & Sons Construction, Inc....

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online