Harper & Son's

Harper & Son's - 1:30pm to 2:30pm: 150 loaded dump...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Brandon Fallaw brandonfallaw@yahoo.com (478)295-2091 04/14/2010 9:30am to 12pm: 150 moved mud from pond to hill. 1pm to 2:30pm: 150 moved mud. 2:30pm to 7:45pm: 150 load both dump trucks with mud from pond. 04/15/2010 7:15 to 12pm: 150 got mud from pond and loaded both dump trucks. 1pm to 8:30pm: 150 loaded dump trucks. 04/16/2010 7:30pm to 12:30pm: 150 loaded dump trucks.
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 1:30pm to 2:30pm: 150 loaded dump trucks. 3:00pm to 6pm: poured cement at Marina across road and MH. 04/17/2010 8pm to 1:15pm: 150 loaded dump trucks. 11pm to 1:15pm: 270 loaded dump trucks. 2:15pm to 5:30pm: 270 pushed mud to 270 to pond. 2:15pm to 5:30pm: 270 loaded trucks. 5:30pm: 270 dressed up pond....
View Full Document

Ask a homework question - tutors are online