Group Project

Group Project - BUAD1020003/006GroupProject...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
BUAD-1020-003/006 Group Project DUE DATE: November 30, 2009 VALUE: 20% of Final Grade Summary:  The final project consists of real-world case observations conducted in groups. A  brief presentation and short report comprise your final project grade. Projects will be selected by  the groups in consultation with me. Groups of no more than 6 students will select a company,  restaurant, or organization of their choice and interview a manager. The focus of the interview  will be the type of information technology system the organization utilizes. More information on  this will be provided throughout the semester. A two-page report and a 7-10 minute presentation  will be required of all groups. Prerequisites:  Group of no more than 6 students A manager a company, restaurant, or organization of their choice Interview: Be formal when interviewing
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

Group Project - BUAD1020003/006GroupProject...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online