Lab 3_Notes - County Operations Center project You will...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
County Operations Center project . You will have a chance to observe underground utility installation. Your lab report should include descriptions for both projects in the normal sections 1 and 2, so make sure you find out about the project scope, general contractor(s), and key subcontractor(s), contract type(s), and observe the project condition at the time of your visit. Specific Questions: Utility Installation: Describe the activities that you observe. Give a DETAILED breakdown of a STEP BY STEP (number the steps) process to install the 16 inch gas line and/or the 36” HDPE storm drain. (What’s HDPE?) Provide documentation with labeled photographs of as many of the steps as you can. For each step, indicate the equipment, material, and labor needed, and estimate the approximate duration of this step. Is this duration constant every time that operation is conducted, or are there reasons that there might be variation from place to place? What special practices are used to make sure the gas line does not leak?
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

Lab 3_Notes - County Operations Center project You will...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online