Lab 5 - Metal plates cover the open areas Covered with new...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Metal plates cover the open areas Covered with new asphalt Crane holds the top beam in place while the column is bolted together. Concrete filled on top Distributes the load laterally. 16 Aggregate Pipe Slurry Soil Walid Hamidy Con E 280 Lab 5 Steel Construction Table of Contents 1. Project Information ...... 2 2. Project Conditions ....... 4 3. Supply Chain.. .. 5 4. Erection Details................................................. ... 5 5. Vocabulary. 6 6. Details. .. 11 7. Safety Toolbox . 13 8. Work cited . 16 List of Figures Figure 1: Map of County Operations Center Project ..... 2 Figure 2: 3DModel of Completed County Operations Center Medical Examiner Office.. 2 Figure 3: Computer Rendition of Completed Conference Center ........... . 3 Figure 4: Where Did the HPDE Go?................................... ... 4 Figure 5: Beam and Column Connection Drawing .. .... 5 Figure 6: Metal Decking ....... 7 Figure 7: Beam Pocket. 8 1 | P a g e Walid Hamidy Con E 280 Lab 5 Steel Construction .. Figure 8: Baseplate.. . 8 Figure 9: Anchor Bolt.. .... 9 Figure 10: Wide Flange Section.. .....
View Full Document

This note was uploaded on 06/27/2010 for the course CON E 280 taught by Professor Wal.sh during the Spring '10 term at SD State.

Page1 / 15

Lab 5 - Metal plates cover the open areas Covered with new...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online