1. In a Gnatt chart, which of the following is signified as a red bar with a crosshatched pattern?
2. Which schedule resource constraint solution is best used when there is a program benefit to using resources other than those originally planned?
3. Prior to using the 14-Point Schedule Metrics, the total number of tasks with level work (i.e., lowest level discrete tasks) needs to be calculated. This describes which of the following data types?
4. How does the Integrated Master Schedule (IMS) relate to the Integrated Master Plan (IMP)?
5. Which of the following are advantages of network diagrams? (Select three that apply.)