class_work - Constraint 4 Solution X1 X2-2.67 2.67 X 1 X 2...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
Max 5x1 + 5x2 s.t. Variables sign RHS Slack Objective Function 5 7  = Max P Profit/cost 46 Constraint 1 1 0 ≤ 6 Constraint 1 5 1 Constraint 2 2 3 ≤ 19 Constraint 2 19  0.00  Constraint 3 1 1 ≤ 8 Constraint 3 8  0.00  soultions X1 X2 5 3 x 1  ≤6 2x 1  + 3x 2  ≤ 19 x 1  - x 2  ≤ 8 x 1 ,x 2  ≤ 0 X 1 X 2
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Variables sign RHS Slack Objective Function 3 4  = Max P Profit/cost 2.67 Constraint 1 -1 2 ≤ 8 Constraint 1 8  -    Constraint 2 1 2 ≤ 12 Constraint 2 2.67  9.33  Constraint 3 2 1 ≤ 16 Constraint 3 -2.67  18.67  1 1 ≥
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Constraint 4 - Solution X1 X2-2.67 2.67 X 1 X 2 Change Signs Variables sign RHS Objective Function 3 2 = Max P Profit/cost 10.00 Constraint 1 1 1 ≥ 4 Constraint 1 4.00 Constraint 2 3 4 ≤ 24 Constraint 2 14.00 Constraint 3 1 ≥ 2 Constraint 3 2.00 1-1 ≥ Constraint 4 0.00 Solution X1 X2 2 2 X 1 X 2 Slack - 10.00 - 0.00...
View Full Document

This note was uploaded on 08/28/2010 for the course ACCT ac101 taught by Professor Carlson during the Fall '10 term at Western New England University.

Page1 / 4

class_work - Constraint 4 Solution X1 X2-2.67 2.67 X 1 X 2...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online