HW-04-28-10s-Ch30

HW-04-28-10s-Ch30 - IE 131 Solutions for Problems due Apr...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
IE 131 Solutions for Problems due Apr 28 (Ch 30) 30.3 A time standard of 0.25 min has been set in a stamping operation. The plant uses a standard hour plan at $10/hr with a daily guarantee of 8 hours pay minimum. Determine the daily earnings of a worker whose daily output for two days are: (a) 1800 pieces and (b) 2200 pieces. Solution : (a) H std = 1,800(0.25/60) = 7.5 hr. With a guaranteed base rate, W = $10.00(8.0) = $80.00 for the first day (b) H std = 2,200(0.25/60) = 9.167 hr W = $10(9.167) = $91.67 for the second day 30.6 In a certain repetitive manual operation, the standard time = 2.50 min per work unit and the worker's base rate = $9.00/hr. The plant's policy is to pay the worker a weekly wage for his weekly output. During one 40-hour workweek, the daily output in work units was: 200, 230, 180, 220, and 240 for the five days. Determine the worker's wage for the week under the following payment plans: (a) day rate, (b) standard hour plan with guaranteed base rate, and (c) bonus-sharing plan where bonus sharing factor p = 0.35. Finally, (d) same as (b) except the worker is paid daily (8 hours/day) for his daily output. What are his weekly earnings? Solution
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

HW-04-28-10s-Ch30 - IE 131 Solutions for Problems due Apr...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online