Last hw - Activity Days A E(t) a m b E(t) V(t) ES EF A 8 10...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Activity Days A E(t) a m b E(t) V(t) ES EF A 8 10 12 10 4/9 LS LF B 6 7 9 7 1/4 A 10 D 20 H 15 C 3 3 4 3 0 10 10 30 40 55 K 7 D 10 20 30 20 11 1/9 A 10 10 30 F 10 40 55 62 69 E 6 7 8 7 1/9 C 30 40 62 69 F 9 10 11 10 1/9 B, D, E 30 40 I 11 G 6 7 10 7 4/9 B, D, E B 7 40 51 H 14 15 16 15 1/9 F 7 51 62 J 7 I 10 11 13 11 1/4 F 23 30 55 62 J 6 7 8 7 1/9 G,H G 7 55 62 K 4 7 8 7 4/9 I, J 10 17 L 1 2 4 2 1/4 G,H C 3 E 7 48 55 L 2 3 3 10 17 19 20 23 23 30 17 19 a) Construct a network b) Determine E(t) and V(t) c) Determine ES, EF, LS, and LF d) Determine critical path e) Determine probability that proj will be finished in 70 days V(t) Vi = 4/9+100/9+1/9+1/9+1/4+4/9 V(t) Vi = 12.47 = 3.5 E(t) = 69 P(Z(70 - 69)/3.5) P(Z(70)= 0.286 = .565 = 56.5% Immed. Pred. Activity ES LS t Monthly cost A 6 10 1.67 1,666.67 $6,666.67 B 1 4 2 14 7.00 7,000.00 $28,000.00 C 3 3 7 5 0.71 714.29 $2,857.14 D 4 9 3 6 2.00 2,000.00 $8,000.00 E 6 6 10 14 1.40 1,400.00 $5,600.00 F 14 15 11 13 1.18 1,181.82 $4,727.27 G 12 18 2 4 2.00 2,000.00 $8,000.00 H 14 14 11 6 0.55 545.45 $2,181.82 $2,181....
View Full Document

This note was uploaded on 09/08/2010 for the course BUS 190 at San Jose State University .

Page1 / 11

Last hw - Activity Days A E(t) a m b E(t) V(t) ES EF A 8 10...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online