Mid - Mid-Term #2 Practice Exam Project Crashing/PERT/LP...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Mid-Term #2 Practice Exam Project Crashing/PERT/LP Graphical Solution 1. The following data were obtained from a study of the times required to overhaul a chemical plant: NORMAL CRASH ACTIVITY PREDECESSORS TIME COST TIME COST A - 5 4 3 6 B - 5 3 1 5 C A 10 4 5 7 D B 7 4 2 6 E A 6 3 2 5 F C,D 11 6 5 9 G C,D 6 3 4 6 H E,F 5 2 1 4 I G 4 2 1 5 Note: Costs are given in thousands of dollars; time in weeks. (a) Find the project time and cost using normal times everywhere; (b) Compute the marginal crash costs and available compression for all of the activities; (c) Develop the least cost crashing schedules using the path list and breakpoint table analysis described in class, through the fourth iteration in your breakpoint table. (d) By interpolation in your breakpoint table determine the cost of the schedule for 24 days; also determine project completion time for a project budget of $35,000 dollars. 2. The following data were obtained from a study of the times required to overhaul a
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 09/08/2010 for the course BUS 190 at San Jose State University .

Page1 / 3

Mid - Mid-Term #2 Practice Exam Project Crashing/PERT/LP...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online