CH07-ahw - SP10 BUS3-140 7.5 GPE's total cost = $4,600,000...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
SP10 BUS3-140 7.5 GPE’s total cost = $4,600,000 = [($15 × 300,000) + $100,000] FMS’s total cost = $4,400,000 = [($14 × 300,000) + $200,000] DM’s total cost = $4,400,000 = [($13 × 300,000) + $500,000] The total cost for Dedicated Machinery and Flexible Manufacturing System the same and lowest. 7.6 15 x + 100,000 = 14 x + 200,000. Therefore x = 100,000 14 x + 200,000 = 13 x + 500,000. Therefore x = 300,000 GPE is best below 100,000 FMS is best between 100,000 and 300,000 DM is best over 300,000 7.7 Based on the solution to Problem 7.6 at 75,000 units use GPE at 275,000 units use FMS at 375,000 units use DM
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 09/08/2010 for the course BUS 140 at San Jose State University .

Page1 / 2

CH07-ahw - SP10 BUS3-140 7.5 GPE's total cost = $4,600,000...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online