presentation help 2

Presentation help 2 - 1 San Jose to Merced Project EIR/EIS California High-Speed Train Project San Jose to Merced High-Speed Train Project EIR/EIS

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 1 San Jose to Merced Project EIR/EIS California High-Speed Train Project San Jose to Merced High-Speed Train Project EIR/EIS South of Diridon Station to Tamien Station Alternatives Analysis Community Workshop March 2, 2010 2 San Jose to Merced Project EIR/EIS California High-Speed Train Project Meeting Purpose and Agenda Purpose • Present additional detail on alternative alignment options in the south of Diridon Station area • Solicit input on community needs and values • Share thoughts on the alternatives being evaluated with a panel of local leaders Agenda • Interactive Open House: 6:30 - 7:15 p.m. • Presentation: 7:15 – 7:40 p.m. • Panel Discussion and Q&A: 7:40 – 9:00 p.m. • Resume Open House: 9:00 – 9:30 p.m. 3 San Jose to Merced Project EIR/EIS California High-Speed Train Project Environmental Review Schedule & Alternatives Analysis Process 4 San Jose to Merced Project EIR/EIS California High-Speed Train Project San Jose to Merced Alternative Alignments Under Consideration 5 San Jose to Merced Project EIR/EIS California High-Speed Train Project Refined Program Alignment Program Alignment SR 87 / I-280 Suggested by City of San Jose Move HST line away from neighborhood Constructability issues over freeways South of Caltrain Tracks Numerous property takes Park impacts Three Tracks Severe operating constraints for Caltrain Downtown Tunnel (Additional Study Needed) Construction complexity o Poor soils o Groundwater issues o Mined station o 110’ underground Costs 6 times base case Downtown Aerial Numerous property takes Impacts City’s planned development Visual impacts San Jose Station Approach Subsection 6...
View Full Document

This note was uploaded on 09/15/2010 for the course BUAD 302 taught by Professor Snyder during the Spring '07 term at USC.

Page1 / 26

Presentation help 2 - 1 San Jose to Merced Project EIR/EIS California High-Speed Train Project San Jose to Merced High-Speed Train Project EIR/EIS

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online