Work Breakdown Structure

Work Breakdown Structure - The purpose of this worksheet is...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
1.6 Data 1.7 Peculiar Support Equip 1.8 Common Support Equip 1.5.1 Equipment 1.5.2 Services 1.5.3 Facilities 1.8.1 1.8.2 1.1.1 Subsystem 1… (Specify Names) 1.1.2 PMP Application Software 1.1.3 PMP System Software Work Breakdown Structure Project Name: Department: Focus Area: Product/Process: Prepared By Document Owner(s) Project/Organization Role Project Closure Report Version Control Version Date Author Change Description Created document. 1. Confidential 41380d3d5a0306483581aa8a57515e0beca554b7 Last printed 4/6/2004 4:07:00 PM
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Work Breakdown Structure Work Breakdown Structure Purpose and Limitations 2. [Replace this text with a statement of the purpose and limitations of this worksheet, or use the following sample.] 3.
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: The purpose of this worksheet is to: Identify the work to be done. Identify the types of resources required for the work. Develop estimates for each work element. Identify storage locations. This worksheet does not address: Who will perform the work. When the work will be completed. 4. Confidential Page 2 07:30:24 Work Breakdown Structure Organization Chart Confidential Page 3 07:30:24 Work Breakdown Structure Worksheet Work ID Work Name Description Include (Completion Criteria) Customer Asset Type Complexity Estimate d Effort Skill Required Dependency Hand Off To Storage/Loc ation 1.0 1.1 1.1.1 1.1.2 1.1.3 2.0 2.1 2.1.1 2.1.2 Confidential Page 4 07:30:24...
View Full Document

This note was uploaded on 09/22/2010 for the course MKT MKT571 taught by Professor Whiting during the Spring '10 term at University of Phoenix.

Page1 / 4

Work Breakdown Structure - The purpose of this worksheet is...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online