MAN435-M6A - MAN-435 Project Management Project Management...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
MAN-435 Project Management Project Management: Achieving Competitive Advantage, by Jeffrey K. Pinto, (Upper Saddle River, New Jersey: Pearson Prentice-Hall, 2007). ISBN-13: 978-0-558-39543-8 Module 6A Problems: Critical Chain Project Management Refer to the Supplemental Reading ("Causes of Project Delay") as needed. Then complete Problems 2 and 3 on page 373. 2. In considering how to make a big change in organizational operations (as in the case of switching to CCPM), why is it necessary to go through such a comprehensive set of steps? That is, why does a shift in project scheduling require so many other linked changes to occur? Goldratt developed a theory of change in an organizations operation. Indicating that poor effects within a business’ operations stem few causes and when these causes are traced to their origins they were a result of a few core issues. When examining these problems, Goldratt designed five key steps in a theory of constraint methodology. 1. Identify the system constraint
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 3

MAN435-M6A - MAN-435 Project Management Project Management...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online