Bar Chart

Bar Chart - (40 days 1.3.2.1 Install Air Navigation Service...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
on: 5/1 6/1 7/1 8/1 9/1 10/1 11/1 Project Task: 1.0 Air Traffic Control (210 Days) 1.1 Develop Communication (10 days) Develop Control Pilot Data Link Center(30 days) 1.2 Develop Security System (10 day) 1.2.1 Develop FBI (1 day) 1.2.2 Develop Database (10 days) 1.2.3 Install Video Control Center (20 days) 1.3 Develop Operation Control (40 days) 1.3.1 Develop Ground Control (30 days) 1.3.1.1 Develop Departure Manager (DMAN) (5 days) 1.3.1.2 Develop Arrival Manager (AMAN) (5 days) 1.3.2 Develop Air Control
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: (40 days) 1.3.2.1 Install Air Navigation Service Provider (ANSPCA) (20) 1.5 Develop Sensors (5 days) 1.5.1 Develop Radar (5 days) 1.4 Develop Accounting (10 days) 1.4.1 Develop Airline Management (10 days) 1.4.2 Develop Employee Management (10 days) 1.4.2.1 Develop Employee Records (10 days) 1.4.2.2 Develop Employee Detail (5) Develop Fuel System (20 days) Develop Backup System ( 20 days) 10 + 30 + 40 + 40 + 30 + 20 + 20 + 10 = 210...
View Full Document

{[ snackBarMessage ]}

Page1 / 2

Bar Chart - (40 days 1.3.2.1 Install Air Navigation Service...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online