3b CPM problem with solution as PDF

3b CPM problem with solution as PDF - * D:5 * G:3 * ES:0...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
B:4 E:5 A:3 C:2 F:4 Solve the following CPM network, assuming the deadline is t = 21. That is, calculate ES, EF, LS, LF and the slack “s” for each activity assuming the deadline for the project is 21. Identify the critical activities and the critical path. D:5 G:3
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
SOLUTION E:5 C:2 F:4
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: * D:5 * G:3 * ES:0 EF:3 LS:2 LF:5 s: 2 ES:3 EF:7 LS:5 LF:9 s: 2 ES:3 EF:5 LS:7 LF:9 s: 4 ES:7 EF:12 LS:9 LF:14 s: 2 ES:12 EF:16 LS:14 LF:18 s: 2 ES:7 EF:12 LS:13 LF:18 s: 6 ES:16 EF:19 LS: 18 LF:21 s:2 The critical activities are A, B, D, F and G Critical path is ABDFG B: 4 * A: 3 *...
View Full Document

This note was uploaded on 10/07/2010 for the course GSC 3600 taught by Professor Verma during the Winter '10 term at Wayne State University.

Page1 / 2

3b CPM problem with solution as PDF - * D:5 * G:3 * ES:0...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online