1 2 5 6 7 a:6 b:4 d:3 c:5 i:4 j:4 Assume Deadline =20 3 e:7 h:3 g:4 f:6 4 Solve the Network Problems on Project Management Problem 1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Solution 1 2 5 6 7 a:6 b:4 d:3 c:5 i:4 j:4 ES=11 EF=15 LS=16 LF=20 ES=13 EF=17 LS=16 LF=20 ES=10 EF=13 LS=13 LF=16 ES=4 EF=10 LS=7 LF=13 ES=6 EF=9 LS=13 LF=16 ES=0 EF=5 LS=8 LF=13 ES=0 EF=6 LS=7 LF=13 s= 3 s= 12 s= 3 s=7 s=8 s= 3 s= 3 Assume Deadline =20 For project: Slack= LF-EF =3 3 e:7 h:3 g:4 f:6 ES=0 EF=4 LS=3 LF=7 ES=4 EF=11 LS=9 LF=16 s=7 s=5 ES=4 EF=8 LS=16 LF=20 s=5 4 The Critical Activities are b,f,h,j and the Critical Path is 1-3-4-6-7
Background image of page 2
Problem 2 1 2 3 5 7 8 a:4 b:3 d:1 c:2 k:4 g:5 i:1 l:2 Assume Deadline =13 4 6 e:2 h:1 j:3 f:2 Solve the Network
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
1 2 3 5 7 8 a:4 b:3 d:1 c:2 k:4 g:5 i:1 l:2 ES=5 EF=9 LS=9 LF=13 ES=4 EF=6 LS=11 LF=13 ES=3 EF=4 LS=12 LF=13 ES=3 EF=4 LS=10 LF=11 ES=3 EF=8 LS=5 LF=10 ES=4 EF=5 LS=8 LF=9 ES=0 EF=2 LS=3 LF=5 ES=0 EF=4 LS=4 LF=8 s= 2 s= 2 s= 2 s=7 s=4 s=3 s=9 s=7 Assume Deadline =13 For project: Slack= LF-EF =2 4 6 e:2 h:1 j:3 f:2 ES=0 EF=3 LS=2 LF=5 ES=3 EF=3 LS=5 LF=5 ES=3 EF=5 LS=8 LF=10 ES=3 EF=5 LS=7 LF=9 s=4 s= 2 s=5 s=4 ES=8 EF=11 LS=10 LF=13
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 7

Netwrok problems with solutions as PDF - Problems on...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online