Assign 11 -4

Assign 11-4 - Part 2 a Per Net present value A C B D b Per Project profitability index B C A D

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Problem 12-13A Part 1. A = 42,000/140,000 = 0.3 B = 49,400/190,000 = 0.26 C = 49,000/175,000 = 0.28 D = 31,740/138,000 = 0.23
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Part 2. a. Per Net present value: A, C, B, D b. Per Project profitability index : B, C, A, D...
View Full Document

This note was uploaded on 10/10/2010 for the course ACCT 225 S taught by Professor Webster during the Spring '10 term at Franklin.

Ask a homework question - tutors are online