Quiz_ SAP MRP Concepts Quiz

Quiz_ SAP MRP Concepts Quiz - Quiz: SAP MRP Concepts Quiz

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
SAP MRP Concepts Quiz Submitted by cmd5150 on 3/5/2010 3:10:52 PM Points Awarded 8 Points Missed 0 Percentage 100% 1. When using reorder point planning, a new order is generated by MRP when the stock level falls below the __________________. A. order quantity B. lot size C. reorder point D. safety stock Points Earned: 1/1 Correct Answer: C Your Response: C 2. When using consumption-based planning, net requirements calculations are triggered by either an independent or dependent requirement. The net requirements calculation is triggered when stock levels fall below a reorder point or by forecast requirements calculated from past consumption data. Points Earned: 1/1 Correct Answer: False Your Response: False 3. Every material flagged on this list will be planned (processed my MRP) in the next planning run. A. reorder-point planning file B. automatic planning file C. consumption-based planning file D. planning file
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

Quiz_ SAP MRP Concepts Quiz - Quiz: SAP MRP Concepts Quiz

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online