Chapter 03 - Project Management 22 CHAPTER 3 PROJECT MANAGEMENT 3. a. C (3) G (2) H (3) D (2) E (5) B (4) 1 5 1 4 7 12 5 7 9 12 15 11 15 12 10 12 7 12 7 7 4 5 1 5 A (1) 0 1 0 1 F (2) 7 9 10 8 b. A-B-D-E-H, also shown in the network above as the bold path. c. 15 weeks, 1+4+2+5+3.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
23 d. C, 3 weeks; F, 1 week; and G, 1 week. 5. a. 3 (4) 9 (5) 7 (2) 4 (3) 5 (5) 2 (2) 4 6 4 8 8 13 4 7 14 7 9 19 14 19 14 12 12 16 11 8 4 11 9 9 1 (4) 0 4 0 4 6 (6) 8 14 14 8 10 (7) 19 26 26 19 8 (3) 13 16 19 16 b. 1-3-6-9-10. c. The most logical option would be to cut activity 3 by 3 weeks, and then reduce activity 6 or 9 by one week. This is the lowest cost option, and does not create an additional critical path. Another option would be to reduce activities 6 and 9 by a total of 3 weeks, and then reduce activity 3 by one week. This also has the same cost, but creates an additional critical path (1-3-5-8-10). 6.
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 7

Chap003_solutions - Chapter 03 Project Management CHAPTER 3...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online