Chap._300006 - (low boiling point hydrocarbons, such as...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
* HDPE Preparation In 1953 Ziegler in Germany discovered method to prepare high PE whereby high pressure could be avoided. The first plant using Ziegler process came on stream in 1955 by Hoechst A. G. (Germany) whilst the first Phillip and Standard Oil plants (USA) began production in 1957 and 1961.
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: (low boiling point hydrocarbons, such as isobutane) Transition metal coordination polymerization (using Ziegler-Natta or Metallocene Catalysts) solution or slurry or gas-phase HDPE (2-4 atm) x-(CH 2-CH 2 ) -50-110 o C CH 2 =CH 2 + Solvent...
View Full Document

This note was uploaded on 10/16/2010 for the course MATSE 441 taught by Professor Chung,tze-chiang during the Fall '10 term at Pennsylvania State University, University Park.

Ask a homework question - tutors are online