B103331020_analysis

B103331020_analysis - Bid Analysis Water Service Meter...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Bid Analysis Water Service Meter Retrofit Phase 7 PM: Paul Barnes JN/PN: 14436 bdgt. Item Est. Low Bid BID Bid BID Bid BID Bid BID Bid BID Bid BID Bid BID Bid BID Bid BID Bid BID Bid BID no. Description Quantity Units per unit TOTAL per unit TOTAL per unit TOTAL per unit TOTAL per unit TOTAL per unit TOTAL per unit TOTAL per unit TOTAL per unit TOTAL per unit TOTAL per unit TOTAL LOW BIDDER 1 2 3 4 5 6 7 8 9 10 11 1 Construction Photographs 1 LS 35000 $35,000.00 20,000.00 $20,000.00 7,100.00 $7,100.00 500.00 $500.00 60,000.00 $60,000.00 500.00 $500.00 9,685.00 $9,685.00 18,000.00 $18,000.00 9,200.00 $9,200.00 20,237.00 $20,237.00 26,000.00 $26,000.00 2 Meter Retrofit of 1-Inch Water Service 1940 EA 854 $1,656,760.00 810.00 $1,571,400.00 859.00 $1,666,460.00 882.00 $1,711,080.00 950.00 $1,843,000.00 900.00 $1,746,000.00 909.00 $1,763,460.00 855.00 $1,658,700.00 960.00 $1,862,400.00 948.00 $1,839,120.00 1,075.00 $2,085,500.00 3 Meter Retrofit of 1½-inch Water Services 7 EA 1800 $12,600.00 1,230.00 $8,610.00 1,552.00 $10,864.00 1,495.00 $10,465.00 1,700.00 $11,900.00 1,500.00
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.
Ask a homework question - tutors are online