Slide #19 Time 0 1 2 3 CFs -200 200 800 -800 IRR 0% IRR 100% Interest Rate 20% Time 0 1 2 3 CFs -200 200 800 -800 -666.67 CFs (modified) -200 200 133.33 MIRR 46%
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Slide #22 Date r 0 -100 -250 -150 1 400 650 250 IRR 300% 160% 66.67% NPV@ 25% 220 270 50
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Small Budget Large Budget Incremental Cashflow Incremental IRR Slide #29 Time r = 12% Project 1 2 PI NPV 1-20 70 10 3.52 50.47 2-10 15 40 4.53 35.28...
View Full Document

This note was uploaded on 10/20/2010 for the course AD abc123 taught by Professor Cat during the Summer '09 term at City University of Hong Kong.

Page1 / 3

L3_Ch05 - IRR & PI - Small Budget Large Budget...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online