5200_L21 - Wednesday 12:45-2:45pm Room: EERC B45 Allotted...

Info iconThis preview shows pages 1–16. Sign up to view the full content.

View Full Document Right Arrow Icon
EE 5200 - Lecture 21 Fri Oct 15, 2010 Topics for Today : Announcements Software: online students - apply for ATP/ATPDraw license, verify licensing when you receive it by e-mail, and we will mail you the install CD. Office hrs: 2-3pm M,W,F Office: EERC 614. Phone: 906.487.2857 Book exercises from Ch.6,7 solutions posted Upcoming hmwks: Transmission Lines as 2-port networks. Matlab. Chapter 6 - Shunt Capacitance Transmission Lines Using the T-Line models Short Transmission Lines - up to 50 miles (80 km) Voltage Regulation, phasor diagrams Per-phase impedance diagrams (positive seq only) Medium-Length Lines (50 - 150 miles) ABCD parameters for Medium-lines, power flow Long Lines - more than 150 miles (240 km) Derivation of long-line equations, meaning of equations Characteristic Impedance Z C Propagation Constant γ = α + j β Surge-Impedance Loading (SIL) Wavelength, velocity, Traveling waves, reflections
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
EE 5200 - Term Projects Time: Finals Week
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 6
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 8
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 10
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 12
Background image of page 13

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 14
Background image of page 15

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 16
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Wednesday 12:45-2:45pm Room: EERC B45 Allotted Time: ~15-20 minutes per presentation; 2-4 mins between. Start Time Team Members Topic Dereli,Gaikhe Network Loss Coefficients with Distributed Gen Seelam, Sapre Educational GUI for Equal Area and Swing Curves Malichkar, Mehta AGC of DFIG in Wind Power Applications Bunker, Heinisch Voltage & Freq Control for Wind Farm Interconnects Lukowski, Nichols, McCoy PEV and PHEV Vehicle Charging Infrastructure Martin, Norkus Microgrids, Distributed Generation Ahsan (away on family emergency, TBD) Online Teams Schlangen, Millner Passive Methods for Control of Line Loading Badgero, Gollapalli, Town Fault Current Issues for Large Induction Motors Leung + ? PS Xfmrs vs. Variable Freq, Asynch Power Transfer Bolz, Matthews Neutral Grounding for SLG faults Thomasson ??...
View Full Document

This note was uploaded on 10/20/2010 for the course ECE 5200 taught by Professor Bonk during the Fall '10 term at Michigan Technological University.

Page1 / 16

5200_L21 - Wednesday 12:45-2:45pm Room: EERC B45 Allotted...

This preview shows document pages 1 - 16. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online