21(06-10_9e - Pounds required for production Passenger tires lbs lbs Truck tires Plus desired inventory Total lbs lbs Less estimated inventory

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Exercise 21(06)-10 Name: Section: Enter the appropriate amount in the shaded cells below. A red asterisk (*) will appear to the right of an incorrect amount in the outlined cells. GOODSTONE TIRE COMPANY Direct Materials Purchases Budget For the Year Ending December 31, 2008 Rubber Steel Belts
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Pounds required for production: Passenger tires lbs. lbs. Truck tires Plus desired inventory, December 31, 2008 Total lbs. lbs. Less estimated inventory, January 1, 2008 Total units purchased lbs. lbs. Unit price Total direct materials to be purchased Total...
View Full Document

This note was uploaded on 10/22/2010 for the course BUSINESS BAIU09 taught by Professor Mr.ken during the Spring '10 term at American InterContinental University Dunwoody.

Page1 / 2

21(06-10_9e - Pounds required for production Passenger tires lbs lbs Truck tires Plus desired inventory Total lbs lbs Less estimated inventory

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online