26(11)-11_9e - = Assembly direct labor hrs. x /dlr =...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Exercise 26(11)-11 Name: Section: Enter the appropriate amount in the shaded cells below. A red asterisk (*) will appear to the right of an incorrect amount in the outlined cells. a. Activity Cost Activity Pool ÷ Total Activity Base = Activity Ra Casting ÷ machine hours = /machine Assembly ÷ direct labor hrs. = /direct lab Inspecting ÷ inspections = /inspectio Setup ÷ setups = /setup Materials handling ÷ loads = /load b. Entry Lighting Fixtures Activity Activity-Base Usage x Activity Rate = Casting machine hours x /mach. hour
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: = Assembly direct labor hrs. x /dlr = Inspecting inspections x /inspection = Setup setups x /setup = Materials handling loads x /load = Total activity cost Number of units Activity cost per unit ate e hour bor hour ion Dining Room Lighting Fixtures Activity Activity Activity Cost Activity-Base Usage x Rate = Cost machine hours x /mach. hour = direct labor hrs. x /dlr = inspections x /inspection = setups x /setup = loads x /load =...
View Full Document

This note was uploaded on 10/22/2010 for the course BUSINESS BAIU09 taught by Professor Mr.ken during the Spring '10 term at American InterContinental University Dunwoody.

Page1 / 2

26(11)-11_9e - = Assembly direct labor hrs. x /dlr =...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online