26(11)-13_9e - x Activity Rate = Setup setups x/setup =...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Exercise 26(11)-13 Name: Section: Enter the appropriate amount in the shaded cells below. A red asterisk (*) will appear beside an incorrect amount in the outlined cells. a. Single plantwide rate: = = Direct Labor Plantwide Indirect I Hours x Rate = Labor Cost ÷ Units = CDs x /dlr = ÷ = Data cartridges x /dlr = ÷ = b. Activity-based rates: Setup Production Activity cost pool Activity base ÷ setups ÷ Activity rate /setup c. CDs Activity Activity-Base Usage
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: x Activity Rate = Setup setups x /setup = Production support direct labor hours x /dir. labor hr. = Total activity cost Units ÷ Activity cost per unit d. Indirect Labor Cost per Unit Support dlh /dlh Data Cartridges Activity Activity Cost Activity-Base Usage x Activity Rate = Cost setups x /setup = direct labor hours x /dir. labor hr. = ÷...
View Full Document

  • Spring '10
  • Mr.Ken
  • activity rate, Single Plantwide rate, production support, Direct Labor Plantwide, base Activity rate, Rate CDs Data

Page1 / 3

26(11)-13_9e - x Activity Rate = Setup setups x/setup =...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online