27(12)-2B_9e - Within-batch wait-time --- testing...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Problem 27(12)-2B Name: Section: Enter the appropriate amount in the shaded cells below. A red asterisk (*) will appear to the right of an incorrect amount in the outlined cells. 1. Value-added time: Stamping min. Appliance assembly Time to inspect one unit Pack and shipment labeling Total min. Nonvalue-added time: Wait time: Within-batch wait-time --- stamping min. Within-batch wait-time --- final assembly
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Within-batch wait-time --- testing Within-batch wait-time --- shipping Stamping setup Total wait time min. Move time: Move from stamping to final assembly min. Move from final assembly to testing Total move time min. Total non-value-added time min. Total lead time min. Value-added ratio: = 2....
View Full Document

This note was uploaded on 10/22/2010 for the course BUSINESS BAIU09 taught by Professor Mr.ken during the Spring '10 term at American InterContinental University Dunwoody.

Ask a homework question - tutors are online