rubric - Date: _ Team Members: 1. 3. 2. 4. Evaluation of...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Date: ____________ Evaluation of Commuter System 2020 – Milestone #2 Team No. _____ ENGR13100 – Fall 2010 Section No. _____ Team Members: 1. 2. 3. 4. Written Presentation Rubric *Reminder : Online Writing Lab (owl.purdue.edu) is available for writing help. Visuals should be used. Figures, sketches, and tables need captions and should be explained in the text (See owl.purdue.edu). Written presentation score: __________ Milestone 2 – Criteria & Constraints Rubric Category Objectives Professional (3 Pts) Acceptable (2 Pts) Needs Improvement (1 pts) Missing (0 pts) 1. Key Stakeholders and Needs b Describes multiple stakeholders b Makes connection between key stakeholders and their needs b Indentifies the “target audience” identified by the team All 3 boxes are checked 2 boxes are checked 1 box is checked 0 boxes are checked 2. Criteria and Constraints b Identifies at least three key attributes (criteria and constraints) b Criteria are given in the form of attributes (not alternatives)
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 10/29/2010 for the course ENGR 131 taught by Professor Purzer during the Spring '10 term at Purdue.

Page1 / 2

rubric - Date: _ Team Members: 1. 3. 2. 4. Evaluation of...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online